Skip to content
DoosraChartاردو
DoosraChart guide working out run rates on a calculator

Calculator

Run rate calculator: current and projected score

Run rate is runs per over. Cricket counts six balls an over, so 11.4 overs is 70 balls, not 11.4 of anything decimal.

Run rate and projected score

Overs as cricket writes them: 19.3 means 19 overs and 3 balls.

runs an over ( balls). overs left.
PaceRateProjected total
Same pace
One run more an over
Two runs more an over

The formula

Run rate = runs × 6 ÷ balls. In the example: 96 × 6 ÷ 70 = 8.23.

A projection only says what happens if the pace holds; wickets, the death overs and the bowlers left change it.

Related

Before you press calculate

Choose the format first, so the overs left are correct. Then type the runs and overs exactly as the scoreboard shows them.

  • Use the full team total, with extras.
  • Wides and no-balls add runs but not a legal ball, so the over count does not move.

A common mistake

Many fans divide runs by the overs figure on a phone calculator. The answer is wrong whenever the over is not complete, because the number after the dot counts balls out of 6, not tenths.

What the projection tells you

The projection takes the current run rate and applies it to every over left. Rows with more runs an over show what a stronger finish would add. This is simple maths, not a guess of the final score.